The contractor has been completing grading in the new loading dock area at the Amphitheater. The photo below shows the contractor installing forms for concrete and compacting the subgrade materials beneath the future concrete. They hope to be done with all of the concrete work by June 2nd, weather permitting.
The excavation into the hillside along Lodgepole Street has been completed in order to provide more back-of-house area. A new curb along the toe of the slope has been installed. The steep slope has been reseeded and covered with erosion control blankets.